Glass House by NAF Architect & Design

Project description:

This building is based on a simple system of stacking large concrete blocks of 1.0 m x 1.0 m x 1.5m like building blocks on top of one another to make a structure with big undulation like breakwater or wave-dissipating blocks. These large concrete blocks are manufactured at any cement factory in Etajima city, Hiroshima, at a very low price as excess cement is reused and often used for surface of retaining wall or anchors of rafts for cultured oysters. These large concrete blocks are manufactured from leftover concrete whenever there is an order of concrete at cement factory, as there will always be a surplus, and sold as a product instead of discarding. As concrete blocks are manufactured at such a rate, according to the operation situation of the factories, the construction progressed according to the pace of the manufacture of the concrete blocks. The construction of this building was not based on the time schedule, as in standard construction progress, but waited for the stock of large concrete blocks to continue the work; a “slow architecture” perceived ridiculous in modern construction work.

Source: contemporist

~ by kkwu on June 14, 2012.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

 
%d bloggers like this: